The evening before I had spoken with Claire, who along with Steve, was responsible for the finish line of the Guadeloupe – Antigua race and was asked along (perhaps because I admitted to a smidgen of French to assist in possible language difficulties on the VHF). So after completing my clearance formalities at English Harbor, much sped up with the new eSeaClear system, and returning to the boat for a coffee I headed out again at 11:30, tied up my dinghy in Falmouth, walked to the docks in English Harbor, took M&M’s water taxi to Galeon Beach and then walked up to the lookout point above the bluffs at the entrance to English Harbor.
2013-04-26
Arnd
2013 Trip 2013-04-26
My old hosting company, who will remain unnamed although their name starts with “go” and the end rhymes with “baddy”, changed their software with little notice and the original SV-ZANSHIN.COM site stopped working overnight.
Every. Single. Page.
So I’ve transitioned to another provider. These original pages have been migrated, but all the formatting and other features are gone and the will still contain numerous display issues and formatting anomalies.
The manual effort of conversion is too much and not worth the effort involved. Over 1000 blog diary pages like this one are going to remain in this condition. The pictures are full-scale, but won’t expand when clicked. But you can can copy them to view them in their original splendour.